× HOME BANGLADESH POLITICS INTERNATIONAL SPORTS ENTERTAINMENT OPINION ALL PHOTO VIDEO ARCHIVE

Traffic flow becomes normal on Dhaka-Chattogram highway after repair works

BSS

29 Aug 2026 19:13 PM

Vehicular movement on the Dhaka-Chattogram highway under Gozaria upazila in the district has returned to normal.

Md Alrazi Lyon, Sub-Divisional Engineer (SDE) of the Roads and Highways Department, told BSS that the repair work began last night after a hole developed on Asharichar Bridge. As a result, traffic pressure increased on the lane heading towards Dhaka.

The repair work was completed by 10am today, following which vehicles began moving normally on both the lanes of the bridge.

Md Babul Hossain, Officer-in-Charge (OC) of Hasara Highway Police Station, said vehicular movement resumed after 10am. Traffic pressure had been easing since morning, although it took some time for the situation’s return to normal movement after  the long tailback.

At present, vehicles are moving at normal speed on the highway, he said.

Additional traffic police have been deployed at various points along the highway to prevent further congestion.

Samakal English

Editor : Shahed Mohammad Ali

Publisher : Abul Kalam Azad

Address: Times Media Bhabon (4th Floor) 387 Tejgaon Industrial Area, Dhaka-1208 l Phone : 55029832-38 l Advertisement : +8801714080378